檢測變壓器油箱密封試驗(yàn)

檢測變壓器油箱密封試驗(yàn)

發(fā)布日期:2021-03-05 10:25:01 作者: 閱讀次數(shù): 來源:http://yunchanmami.cn

>

檢測密封試驗(yàn)  

油箱密封性試驗(yàn)應(yīng)在裝配完畢后進(jìn)行。帶有可拆卸的散熱器或冷卻器時(shí),可以在拆卸狀態(tài)下試驗(yàn),試驗(yàn)用靜油柱法或靜氣壓法。

1.柱法
靜油柱試驗(yàn)法是在變壓器儲(chǔ)抽柜的注油孔上加裝一根高度為0.6m以上的油管,在油管頂端焊裝一個(gè)貯油桶,以備變壓器油因熱脹冷縮或繞組內(nèi)氣泡溢出作補(bǔ)充用,防止造成缺油。這樣經(jīng)24h后觀察應(yīng)無滲油現(xiàn)象。此方法一般用在160kVA以上的。

2.靜氣壓法
靜氣壓法是在箱蓋上或儲(chǔ)油柜上的通氣孔連接一個(gè)帶有氣壓表的管子,端部裝有旋塞,緩慢施以氣壓到0. 03MPa,然后將旋塞關(guān)閉,經(jīng)24h觀察,油箱各處不得發(fā)現(xiàn)有滲漏現(xiàn)象。所有氣體(空氣或惰性氣體) 是干燥的。氣壓試驗(yàn)時(shí),應(yīng)將儲(chǔ)油柜與油箱相連通,有 氣道的要將玻璃板換成鋼板密封。一般是將儲(chǔ)油柜上吸濕器拆去.接三通接頭.將氮?dú)馄恐械獨(dú)饨?jīng)降壓表閥降壓后通入儲(chǔ)抽柜或膠囊袋中,關(guān)閉閥門,觀壓壓力表12h不顯著降低。對密封式有波紋油箱的變壓器,應(yīng)加0.025MPa壓力12h不滲漏。而按國家標(biāo)準(zhǔn)GBJ148-1990《變壓器驗(yàn)收規(guī)范》規(guī)定,變壓器箱蓋上加0.03MPa24h變壓器本體不滲漏,有載分接開關(guān)加0.06MPa24h不滲漏。在做密封試臉前,有時(shí)要抽真空,它們單位的相互關(guān)系。

1nunHg = 133. 322Pa
lat(工程大氣壓)=0.0980665MPa≈0.1MPa
1mm(標(biāo)準(zhǔn)大氣壓)=0. 101325MPa

Tank seal test

Tank tightness test after assembly. Demolition state with a detachable radiator or cooler, you can test, test static oil column method or static pressure method.

A static oil column method
Static oil column test method is to install a height of 0.6m above the tubing on the filling hole of the transformer storage drawers, a jerry can in the tubing to the top welding to prepare for transformer oil bubble due to thermal expansion and contraction or winding overflow to supplement, to avoid creating short of oil. So that after 24h observation should be no oil leakage. This method is generally more than 160kVA transformer.

(2) static pressure method
Static pressure method is to connect the transformer cover or oil storage cabinet vent pipe with a barometer, the end is equipped with cocks, slow to impose pressure to 0. 03MPa, then cocks Close, observed after 24h, tank throughout not found to have leakage. Gas (air or inert gas) must be dry. Pressure test, the storage cabinet should be connected to the tank through secure airway to the glass replaced with steel plates sealed. Generally, oil storage cabinet dehumidifiers remove them. Pick the tee. Nitrogen bottle of nitrogen through the valve buck buck table access storage drawers or capsule bag, close the valve, the concept of pressure pressure gauge 12h was not significant reduced. 0.025MPa pressure 12h does not leak sealed corrugated tank transformer, should be added. And national standards GBJ148-1990 transformer acceptance of the provisions of the transformer cover plus 0.03MPa24h transformer body does not leak, OLTC to add 0.06MPa24h not leak. In sealed test face, and sometimes to the vacuum, the mutual relations of their units.
1nunHg = 133. 322Pa
of lat (works atm) = 0.0980665MPa ≈ 0.1MPa
1mm (standard atmospheric pressure) = 0. 101325MPa


中國●凱潛━━真誠到永遠(yuǎn)!

重慶凱潛制造有限公司



銷售電話:023-65217597


手機(jī):13452883096(24小時(shí)服務(wù))


傳真:13350355997


網(wǎng)址:         


郵箱:308317328@qq.com <

本文網(wǎng)址:http://yunchanmami.cn/industrynews/2537.html

TAG標(biāo)簽: 上一篇 : 怎么判斷12噸小吊車使用的液壓油過臟? 下一篇 : ZKJ剎車液壓油真空加注機(jī)